Simrad EQ 55 Especificações Página 54

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 53
EQ42/50/52 Installation and service Chapter 9
54
The connection cable between the dual station and the main unit is a special pair-
twisted cable of 15 meters (not extendable), which consists of the following
wires:
104.3002.023
9.5.1 Operation of DS40/42/50/52 remote control
The main unit and the dual station operate in parallel. All key commands on the
dual station are relayed to the main unit EQXX and the display picture is
instantly transferred back via a high speed data link.
Adjust light/contrast in screen and background light in keypad via the
[PWR]
key.
Vista de página 53
1 2 ... 49 50 51 52 53 54 55 56 57 58 59 ... 79 80

Comentários a estes Manuais

Sem comentários